Back to Step 2

PASS 2: Normative Requirements

Case 8: Balancing Client Directives and Public Welfare: Stormwater Management Dilemma

Principles
0
Classes
5
Individuals
Obligations
2
Classes
6
Individuals
Constraints
2
Classes
6
Individuals
Capabilities
3
Classes
5
Individuals

Extracted Ontology Entities

29 RDF entities extracted organized by concept type

Principles Extraction

Principles Individuals
Individuals to Add to proethica-case-8
These are specific people, organizations, and entities in this case
5 Individuals
Individual rdf:type Properties & Relations Source
Competence_StormwaterCase_Facts Committed
Individual Instance
CompetencePrinciple
Concrete Expression: Engineer L conducts additional studies and qualitatively estimates the risk that heavy rainfall could lead to stormwater runoff
Invoked By: Engineer L
Applied To: Risk assessment of stormwater impact on watershed
Interpretation: Professional competence requires thorough risk assessment based on changing conditions
Balanced With:
  • • Project timeline constraints
  • • Available resources for studies
Tension Resolution: Engineer L fulfills competence obligation by conducting studies despite project suspension
Case Relevance: Demonstrates professional diligence in identifying and quantifying environmental risks
Was Generated By: ProEthica Dual Principles Extraction
Generated At Time: 2025-09-29T00:44:14.842579
C8
EnvironmentalStewardship_StormwaterCase_Facts Committed
Individual Instance
EnvironmentalStewardshipPrinciple
Concrete Expression: local environmental standards require steps to safeguard public water sources
Invoked By:
  • • Engineer L
  • • Local environmental standards
Applied To: Protection of watershed and drinking water source from stormwater runoff
Interpretation: Engineering design must comply with environmental standards to protect water resources
Balanced With:
  • • Client budget limitations
  • • Project financial feasibility
Tension Resolution: Client defers compliance, stating 'will address any compliance issues later, if needed'
Case Relevance: Establishes legal and ethical baseline for environmental protection requirements
Was Generated By: ProEthica Dual Principles Extraction
Generated At Time: 2025-09-29T00:44:14.842579
C8
Transparency_StormwaterCase_Facts Committed
Individual Instance
TransparencyPrinciple
Concrete Expression: Engineer L notifies Client X of this risk, advising that additional protective measures should be considered
Invoked By: Engineer L
Applied To: Communication of environmental risks to client
Interpretation: Professional obligation to fully disclose identified risks to client
Balanced With:
  • • Client relationship maintenance
  • • Project continuation
Tension Resolution: Partially fulfilled - Engineer L eventually disclosed risks but not during initial suspension period
Case Relevance: Highlights timing and completeness issues in risk disclosure
Was Generated By: ProEthica Dual Principles Extraction
Generated At Time: 2025-09-29T00:44:14.842579
C8
PublicWelfare_StormwaterCase_Facts Committed
Individual Instance
PublicWelfarePrinciple
Concrete Expression: ensuring that stormwater from the new development will not impact this primary drinking water source for the community
Invoked By: Engineer L's scope of work
Applied To: stormwater management system design for development near community water source
Interpretation: Protection of community drinking water source is a fundamental responsibility in the engineering design
Balanced With:
  • • Client financial interests
  • • Project completion timelines
Tension Resolution: Unresolved - Engineer L notified client but proceeded despite client's refusal to add safeguards
Case Relevance: Central to the ethical dilemma of whether to proceed with inadequate protections
Was Generated By: ProEthica Dual Principles Extraction
Generated At Time: 2025-09-29T00:44:14.842579
C8
ProfessionalIntegrity_StormwaterCase_Facts Committed
Individual Instance
IntegrityPrinciple
Concrete Expression: Despite Engineer L's concerns, Client X insists on proceeding without added safeguards
Invoked By: Engineer L's professional concerns
Applied To: Decision whether to continue with project despite inadequate safeguards
Interpretation: Professional integrity requires standing firm on safety and environmental protection standards
Balanced With:
  • • Client autonomy
  • • Contractual obligations
  • • Economic pressures
Tension Resolution: Unresolved tension - Engineer L's integrity challenged by client's insistence
Case Relevance: Core ethical conflict between maintaining professional standards and client demands
Was Generated By: ProEthica Dual Principles Extraction
Generated At Time: 2025-09-29T00:44:14.842579
C8

Obligations Extraction

New Obligations Classes
Classes to Add to proethica-intermediate
These are new obligations types not currently in the ontology
2 Classes
Class Label Definition Properties & Relations Source
Risk Assessment Obligation Committed
rdfs:subClassOf Obligations
Duty to properly identify, quantify, and communicate risks associated with professional work, including long-term and cumulative risks
Derived From Principle: Professional Competence and Due Diligence
Duty Type: professional
Enforcement Mechanism: Professional standards of practice, liability insurance requirements, court proceedings
Violation Consequences: Professional negligence claims, loss of professional credibility, liability for damages
Example From Case:
  • • Quantifying increased risk from heavy stormwater flows
  • • Conducting additional studies to estimate runoff risk
Confidence Score: 0.75
Extraction Reasoning: Distinct from general Competence Obligation as it specifically requires proactive risk identification and assessment as a standalone duty
Was Generated By: ProEthica Dual Obligations Extraction
Generated At Time: 2025-09-29T00:44:23.152288
C8
Environmental Protection Obligation Committed
rdfs:subClassOf Obligations
Requirement for professionals to protect environmental resources, particularly water sources, from contamination or degradation resulting from their professional work
Derived From Principle: Environmental Stewardship and Public Welfare
Duty Type: professional
Enforcement Mechanism: Environmental regulations, professional licensing boards, and civil/criminal penalties
Violation Consequences: License suspension/revocation, fines, criminal charges, civil liability for environmental damage
Example From Case:
  • • Ensuring stormwater does not impact drinking water source
  • • Compliance with local environmental standards for public water sources
Confidence Score: 0.85
Extraction Reasoning: While Safety Obligation exists, this specifically addresses environmental protection duties that go beyond immediate human safety to include ecosystem and resource protection
Was Generated By: ProEthica Dual Obligations Extraction
Generated At Time: 2025-09-29T00:44:23.152288
C8
Obligations Individuals
Individuals to Add to proethica-case-8
These are specific people, organizations, and entities in this case
6 Individuals
Individual rdf:type Properties & Relations Source
EngineerL_RiskDisclosure_Resumption Committed
Individual Instance
DisclosureObligation
Obligated Party: Engineer L
Obligation Statement: Must notify Client X of quantified risks and recommend protective measures
Derived From: NSPE II.3.a and professional duty of care
Enforcement Context: Professional standards and potential liability
Temporal Scope: Upon work resumption and risk assessment
Compliance Status: met
Case Context: Engineer L notified Client X of risks and advised additional protective measures
Confidence Score: 0.95
Was Generated By: ProEthica Dual Obligations Extraction
Generated At Time: 2025-09-29T00:44:23.152288
C8
EngineerL_PublicWaterSafety_Obligation Committed
Individual Instance
SafetyObligation
Obligated Party: Engineer L
Obligation Statement: Must ensure stormwater management system does not impact community drinking water source
Derived From: NSPE I.1 - Hold paramount public safety, health, and welfare
Enforcement Context: Professional engineering standards and environmental regulations
Temporal Scope: Throughout entire project duration
Compliance Status: pending
Case Context: Engineer L's contractual scope includes ensuring no impact to drinking water source
Confidence Score: 0.95
Was Generated By: ProEthica Dual Obligations Extraction
Generated At Time: 2025-09-29T00:44:23.152288
C8
EngineerL_ReportingToAuthorities Committed
Individual Instance
ReportingObligation
Obligated Party: Engineer L
Obligation Statement: May need to report to authorities if client proceeds without adequate safeguards for public water source
Derived From: NSPE II.1.f - Report violations to appropriate professional bodies
Enforcement Context: Professional ethics enforcement
Temporal Scope: If client proceeds without adequate safeguards
Compliance Status: pending
Case Context: Client X insists on proceeding without added safeguards despite known risks
Confidence Score: 0.7
Was Generated By: ProEthica Dual Obligations Extraction
Generated At Time: 2025-09-29T00:44:23.152288
C8
EngineerL_RiskDisclosure_Suspension Committed
Individual Instance
DisclosureObligation
Obligated Party: Engineer L
Obligation Statement: Must inform Client X of identified risks to drinking water source during work suspension
Derived From: NSPE II.3.a - Disclosure of circumstances that could influence judgment
Enforcement Context: Professional ethics standards
Temporal Scope: At time of work suspension
Compliance Status: unmet
Case Context: Engineer L did not mention potential increased risk during suspension communications
Confidence Score: 0.9
Was Generated By: ProEthica Dual Obligations Extraction
Generated At Time: 2025-09-29T00:44:23.152288
C8
EngineerL_EnvironmentalCompliance Committed
Individual Instance
EnvironmentalProtectionObligation
Obligated Party: Engineer L
Obligation Statement: Must ensure design complies with local environmental standards for public water source protection
Derived From: Local environmental standards and regulations
Enforcement Context: Environmental regulatory enforcement
Temporal Scope: Throughout design and implementation
Compliance Status: pending
Case Context: Local environmental standards require steps to safeguard public water sources
Confidence Score: 0.85
Was Generated By: ProEthica Dual Obligations Extraction
Generated At Time: 2025-09-29T00:44:23.152288
C8
EngineerL_RiskQuantification Committed
Individual Instance
RiskAssessmentObligation
Obligated Party: Engineer L
Obligation Statement: Must properly quantify and assess risks of stormwater impact on drinking water source
Derived From: Professional standard of care and competence
Enforcement Context: Professional liability standards
Temporal Scope: During design phase and when conditions change
Compliance Status: met
Case Context: Engineer L conducted additional studies and qualitatively estimated risks after heavy rainfall
Confidence Score: 0.8
Was Generated By: ProEthica Dual Obligations Extraction
Generated At Time: 2025-09-29T00:44:23.152288
C8

Constraints Extraction

New Constraints Classes
Classes to Add to proethica-intermediate
These are new constraints types not currently in the ontology
2 Classes
Class Label Definition Properties & Relations Source
Environmental Impact Constraint Committed
rdfs:subClassOf Constraints
Boundaries on activities that could affect environmental resources, particularly those critical to public health and safety
Constraint Type: legal
Flexibility: hard
Violation Impact: Environmental damage, public health risks, regulatory penalties, professional liability
Mitigation Possible: Through engineering controls and protective measures
Example From Case:
  • • Cannot allow stormwater to impact community drinking water source
  • • Local environmental standards require safeguarding public water sources
Confidence Score: 0.9
Extraction Reasoning: Distinct from general safety constraints as it specifically addresses environmental boundaries that protect natural resources and public health
Was Generated By: ProEthica Dual Constraints Extraction
Generated At Time: 2025-09-29T00:44:21.321126
C8
Contractual Scope Constraint Committed
rdfs:subClassOf Constraints
Limitations on professional actions defined by the specific scope of work agreed upon in a contract, restricting what services can be performed and when
Constraint Type: procedural
Flexibility: negotiable
Violation Impact: Breach of contract, potential liability for work outside scope, payment disputes
Mitigation Possible: Can be modified through contract amendments or change orders
Example From Case:
  • • Engineer L's scope includes ensuring stormwater won't impact drinking water
  • • Work suspension due to client's financial setbacks
Confidence Score: 0.85
Extraction Reasoning: While procedural constraints exist, this specifically addresses contractual boundaries on professional services that differ from general procedural requirements
Was Generated By: ProEthica Dual Constraints Extraction
Generated At Time: 2025-09-29T00:44:21.321126
C8
Constraints Individuals
Individuals to Add to proethica-case-8
These are specific people, organizations, and entities in this case
6 Individuals
Individual rdf:type Properties & Relations Source
Contract_Scope_Boundary Committed
Individual Instance
ContractualScopeConstraint
Constrained Entity: Engineer L
Constraint Statement: Must ensure stormwater from development will not impact primary drinking water source as per contract
Constraint Source: Original contract with Client X
Enforcement Mechanism: Contract terms and professional liability
Temporal Scope: Duration of contract engagement
Severity: critical
Case Context: Part of Engineer L's scope includes ensuring no impact to drinking water source
Confidence Score: 0.85
Was Generated By: ProEthica Dual Constraints Extraction
Generated At Time: 2025-09-29T00:44:21.321126
C8
Environmental_Standards_Compliance Committed
Individual Instance
RegulatoryConstraint
Constrained Entity: Development project
Constraint Statement: Must comply with local environmental standards requiring safeguards for public water sources
Constraint Source: Local environmental standards
Enforcement Mechanism: Regulatory agency oversight and penalties
Temporal Scope: Permanent requirement
Severity: critical
Case Context: Local environmental standards require steps to safeguard public water sources
Confidence Score: 0.95
Was Generated By: ProEthica Dual Constraints Extraction
Generated At Time: 2025-09-29T00:44:21.321126
C8
Client_Budget_Limitation Committed
Individual Instance
ResourceConstraint
Constrained Entity: Project development
Constraint Statement: Cannot exceed available client budget for stormwater management system
Constraint Source: Client X's financial situation
Enforcement Mechanism: Client approval required for expenditures
Temporal Scope: Throughout project duration
Severity: major
Case Context: Client X encounters financial setbacks requiring work suspension; later cites continuing budget limitations
Confidence Score: 0.95
Was Generated By: ProEthica Dual Constraints Extraction
Generated At Time: 2025-09-29T00:44:21.321126
C8
Work_Suspension_Limitation Committed
Individual Instance
TemporalConstraint
Constrained Entity: Engineer L's work
Constraint Statement: Cannot continue contracted work during client-requested suspension period
Constraint Source: Client X's request due to financial setbacks
Enforcement Mechanism: Contractual agreement
Temporal Scope: Several months during suspension
Severity: major
Case Context: Client X requests Engineer L suspend work; work resumes months later
Confidence Score: 0.9
Was Generated By: ProEthica Dual Constraints Extraction
Generated At Time: 2025-09-29T00:44:21.321126
C8
Licensed_PE_Competence_Boundary Committed
Individual Instance
CompetenceConstraint
Constrained Entity: Engineer L
Constraint Statement: Must operate within licensed professional engineering expertise in stormwater control design
Constraint Source: Professional engineering license
Enforcement Mechanism: State licensing board oversight
Temporal Scope: Throughout professional practice
Severity: critical
Case Context: Engineer L has many years of experience in stormwater control design
Confidence Score: 0.95
Was Generated By: ProEthica Dual Constraints Extraction
Generated At Time: 2025-09-29T00:44:21.321126
C8
Drinking_Water_Protection_Requirement Committed
Individual Instance
EnvironmentalImpactConstraint
Constrained Entity: Stormwater management system design
Constraint Statement: Cannot allow stormwater runoff to impact community's primary drinking water source
Constraint Source: Local environmental standards and public health requirements
Enforcement Mechanism: Regulatory compliance and enforcement
Temporal Scope: Permanent - throughout development operation
Severity: critical
Case Context: Community relies on nearby surface water watershed as primary drinking water source
Confidence Score: 0.9
Was Generated By: ProEthica Dual Constraints Extraction
Generated At Time: 2025-09-29T00:44:21.321126
C8

Capabilities Extraction

New Capabilities Classes
Classes to Add to proethica-intermediate
These are new capabilities types not currently in the ontology
3 Classes
Class Label Definition Properties & Relations Source
Risk Assessment Capability Committed
rdfs:subClassOf Capabilities
The competency to identify, analyze, quantify and communicate potential risks and their impacts in professional contexts
Capability Type: analytical
Norm Competence Related: Enables fulfillment of duty to protect public safety and welfare by identifying potential hazards
Skill Level: advanced
Acquisition Method: Professional education, specialized training in risk analysis, field experience with impact assessments
Example From Case:
  • • Engineer L becomes concerned about increased risk to drinking water
  • • Engineer L conducts studies to qualitatively estimate risk
Confidence: 0.9
Generated At Time: 2025-09-29T00:44:21.773191
C8
Client Communication Capability Committed
rdfs:subClassOf Capabilities
The competency to effectively communicate technical concerns, risks, and recommendations to clients, including difficult or unwelcome information
Capability Type: communicative
Norm Competence Related: Enables fulfillment of duty to inform clients of risks and maintain professional transparency
Skill Level: intermediate
Acquisition Method: Professional communication training, client management experience, ethics education
Example From Case:
  • • Engineer L notifies Client X of risk
  • • Engineer L advises additional protective measures should be considered
Confidence: 0.95
Generated At Time: 2025-09-29T00:44:21.773191
C8
Environmental Impact Capability Committed
rdfs:subClassOf Capabilities
The competency to assess and mitigate environmental consequences of professional activities, particularly regarding public resources
Capability Type: technical
Norm Competence Related: Enables compliance with environmental protection obligations and safeguarding of public resources
Skill Level: advanced
Acquisition Method: Environmental engineering education, regulatory training, experience with watershed management
Example From Case:
  • • Ensuring stormwater won't impact drinking water source
  • • Understanding watershed dynamics and contamination risks
Confidence: 0.85
Generated At Time: 2025-09-29T00:44:21.773191
C8
Capabilities Individuals
Individuals to Add to proethica-case-8
These are specific people, organizations, and entities in this case
5 Individuals
Individual rdf:type Properties & Relations Source
EngineerL_StormwaterDesign Committed
Individual Instance
TechnicalCapability
Possessed By: Engineer L
Capability Statement: Design stormwater management systems for large developments
Demonstrated Through: Many years of experience in stormwater control design
Proficiency Level: expert
Enables Obligations: Fulfillment of contractual obligations to design effective stormwater systems
Temporal Aspect: Throughout the project timeline
Case Context: Applied in designing system for residential/commercial development
Confidence: 1.0
Generated At Time: 2025-09-29T00:44:21.773191
C8
EngineerL_RiskIdentification Committed
Individual Instance
RiskAssessmentCapability
Possessed By: Engineer L
Capability Statement: Identify and assess risks of stormwater impact on drinking water sources
Demonstrated Through: Recognizing increased risk during preliminary design phase and conducting additional studies
Proficiency Level: advanced
Enables Obligations: Duty to protect public safety and welfare
Temporal Aspect: During preliminary design and after work resumption
Case Context: Identified potential increased risk to community water source from development
Confidence: 0.9
Generated At Time: 2025-09-29T00:44:21.773191
C8
EngineerL_ClientAdvisory Committed
Individual Instance
ClientCommunicationCapability
Possessed By: Engineer L
Capability Statement: Communicate technical risks and recommendations to clients
Demonstrated Through: Notifying Client X of risks and advising on protective measures
Proficiency Level: intermediate
Enables Obligations: Professional duty to inform clients of project risks
Temporal Aspect: After work resumption when risks were quantified
Case Context: Communicated watershed contamination risks to Client X despite client resistance
Confidence: 0.85
Generated At Time: 2025-09-29T00:44:21.773191
C8
EngineerL_EnvironmentalCompliance Committed
Individual Instance
EnvironmentalImpactCapability
Possessed By: Engineer L
Capability Statement: Ensure development compliance with environmental standards for water protection
Demonstrated Through: Knowledge of local environmental standards requiring safeguards for public water sources
Proficiency Level: advanced
Enables Obligations: Compliance with environmental regulations and protection of public resources
Temporal Aspect: Throughout project, especially after rainfall event
Case Context: Applied knowledge of environmental standards to recommend additional protective measures
Confidence: 0.9
Generated At Time: 2025-09-29T00:44:21.773191
C8
LicensedPE_ProfessionalJudgment Committed
Individual Instance
TechnicalCapability
Possessed By: All Licensed PEs
Capability Statement: Exercise professional engineering judgment in technical matters
Demonstrated Through: Professional engineering license and years of experience
Proficiency Level: advanced
Enables Obligations: Professional standard of care and public protection duties
Temporal Aspect: Throughout professional practice
Case Context: Engineer L's professional judgment about risks despite client preferences
Confidence: 0.95
Generated At Time: 2025-09-29T00:44:21.773191
C8